|
CENAR started a mould-room project, and following were designed
and fabricated e.g. “Styroformer machine, Electron cutter, Block
verifier, Alloy melter and Shielding Trays” etc by Mr. Mohammad
Hussain Sr. Tech (Electronics) on the basis of his own expert efforts
after receiving successful training on mould-room techniques at
Australia. These equipment are fabricated at very economical cost of Rs.
75000/- approximately and saved more than Rs. 3 Million in foreign
exchange. After completion of moulding / shielding equipment , this
centre has started first highly equipped mould-room among all PAEC
medical centers, to improve treatment quality in Radiotherapy, and
proper dose delivery system for the patients and reduce exposure to the
normal and vital areas.
|